
Push Piers & Drainage System in Port Orchard, WA
Challenge This home in Port Orchard, WA had 4” of settlement due to soil erosion from the roof water system. The home was constructed of ¾” ship lap and faced with full brick on top of a thickened concrete stem wall. The client wanted to stabilize the foundation without damaging the brick facade overlay which […]